Gove Airport - Satellite Ground Station Equipment Shelter Replacement

 

Client: Airservices Australia

Value: $518,000 incl. GST

Grenfell Build successfully delivered a secure and durable equipment shelter foundation for the Satellite Ground Station Equipment Shelter at Gove Airport.

Scope of works included:

  • Site Preparation & Foundations: Demolition of existing satellite, site clearing, levelling, and constructing reinforced concrete foundations.

  • Shelter Installation: Installation of a weather-resistant structure onto a new concrete foundation within the existing Gove SGS Compound.

  • Utility Connections: Setting up power and utilities to support equipment operation by trenching conduits and pits adjacent to the existing SGS Equipment Shelter.

  • Security Measures: Installing secure access controls in line with airport protocols.

  • Project Handover: Providing all final documentation, warranties, and an operational briefing.

 