Gove Airport - Satellite Ground Station Equipment Shelter Replacement
Client: Airservices Australia
Value: $518,000 incl. GST
Grenfell Build successfully delivered a secure and durable equipment shelter foundation for the Satellite Ground Station Equipment Shelter at Gove Airport.
Scope of works included:
Site Preparation & Foundations: Demolition of existing satellite, site clearing, levelling, and constructing reinforced concrete foundations.
Shelter Installation: Installation of a weather-resistant structure onto a new concrete foundation within the existing Gove SGS Compound.
Utility Connections: Setting up power and utilities to support equipment operation by trenching conduits and pits adjacent to the existing SGS Equipment Shelter.
Security Measures: Installing secure access controls in line with airport protocols.
Project Handover: Providing all final documentation, warranties, and an operational briefing.